House finishing: internal work in a private house

When it comes to completing a private home’s interior, meticulous attention to detail can turn an ordinary structure into a cosy, welcoming residence. The procedure entails a number of critical actions meant to improve the living areas’ appearance and usability. Every choice you make, from selecting the best materials to carrying out accurate installations, affects how the house looks and feels overall.

The choice of appropriate materials is one of the most important factors in house finishing. This covers everything, from wall coverings like paint, wallpaper, or decorative paneling to flooring options like hardwood, laminate, or tile. Every material has a certain allure and usefulness that affects the interior’s atmosphere and upkeep needs.

The design and implementation of plumbing and electrical installations are equally crucial. These components are necessary to guarantee the smooth and effective operation of the home. Meticulous planning during this phase, from arranging light fixtures and outlets to plumbing connections for kitchens and bathrooms, minimizes discomfort in the future and maximizes living space.

The installation of windows, doors, and interior partitions is another crucial component of interior work. Not only do these components divide spaces, but they also greatly enhance each room’s overall design and functionality. Appropriate door and window placement optimizes natural light and ventilation, and strategically placed partitions delineate spaces without interfering with the house’s flow.

The final details complete the interior design. This entails picking and installing fixtures that go with the overall design concept, such as light switches, faucets, and handles. This stage involves paying close attention to detail to make sure that every part of the house blends together harmoniously, giving its occupants a sense of cohesion and welcome.

The procedure for conducting internal works

The interior decoration of the house is specifically done so that special finishing work can be completed concurrently with it. Saving money and ensuring on-time facility delivery depend on adhering to the order in which individual labor operations are performed.

It is important to note that large construction companies and private housing developers both struggle with consistency amongst specialists. Additionally, it can occasionally be seen in them in a stronger form, which is connected to both the logistical characteristics and the busy brigades at other locations.

Here is an illustration of this kind of inconsistent interior design.

There are plasters throughout the house. They questioned why the wiring was not mounted on the walls before the lighthouses were installed. They were informed that you could begin plastering since the electrician team was running late. Consequently, electricians benefit when they have already completed masking work and are required to create the plaster layer’s strokes, which are then launched by malyars after the wiring has been installed. As a result, the electricians performed additional labor using a costly power tool, and the malyars worked on the strobe’s seal.

All internal work needs to be clearly divided, and the order of execution needs to be developed in collaboration with others, to prevent this from happening.

The sequence of stages

Three consecutive stages can be used to represent the finish:

  • black;
  • prejudice;
  • finish.

These stages can vary greatly because a room can have three different types of surfaces: the floor, the walls, and the ceiling. Therefore, the "top down" concept is appropriate for the majority of works.

He might not always work. Consequently, the installation of drywall structures and windows are completed first. Other "dry" tasks, such as installing laminate flooring, wall panels, suspended ceilings (apart from plasterboard), and hardwood floors, come last.

Additionally, special tasks related to finishing are completed in phases. For instance, external wiring is done after finishing, and trunk pipeline installation is done either during or before her draft. The installation of pipes in them prior to completion and the use of the stroke device even during the construction phase are examples of hidden internal wiring. After the decoration is finished, plumbing fixtures and reinforcement (such as mixers, shells, toilets, and baths) are installed.

The electrical industry operates under the same principle. After plastering, the wiring is mounted to the distributors, shields, sockets, and switches; however, the lighting fixtures, switches, and sockets themselves are installed following all finishing activities.

Every instance is unique because of the range of interior decorators and designers that are employed. Clear planning phases are crucial, though, and they must be completed before moving on to the decorating process.

When it comes to home remodeling, a private home’s interior finishing work is vital to improving both appearance and utility. Every little thing helps to create a cozy and aesthetically pleasing living area, from choosing the best materials for the walls, floors, and ceilings to making sure the installation processes are done correctly. This article explores the fundamentals of house finishing and provides helpful advice on selecting materials, comprehending the procedure, and striking a balance between interior design aesthetics and functionality.

Types of interior decoration of the house

Interior decoration firms and specialists differentiate between the following work complexes:

  • Plaster. Their purpose is the geometric alignment of walls and ceilings using plaster solutions.
  • The device of the floor screed. This is a variety of black decoration, in which the floor is prepared for laying the finish coating.
  • Glass – window installation.
  • Parting finish. Consists in putty walls and ceilings before finishing.
  • Painting work, that is, the coloring of surfaces with paints.
  • Facing – laying tiles.
  • Carpentry – wooden floors, laying laminate or parquet, door installation.
  • Dry construction, that is, installation of drywall structures, suspended ceilings, PVC and MDF panels.
  • Pumping with wallpaper.

You should linger longer in some significant stages.

Plassing walls

Its purpose is to use gypsum, cement, lime, and cement-license solutions to align the wall surfaces. The latter consist of different dry mixes of aggregate, gypsum, and inhibitor (to prevent the gypsum from grabbing immediately).

Plasting is done prior to the installation of the heating, sewage, and water supply systems but after the wiring is installed. They frequently make the opposite decision in the winter, which is highly inconvenient and lowers the quality.

Three dosages are tested for plasticity: spray, soil, and covering. Every layer that came before it should have acquired the initial strength before the next. The best foundation for putty to follow is gypsum, which doesn’t require laborious rubbing and can be covered with spray and soil composed of cement or lime mortar, which is commonly used to create shelters.

Pouring floors

It can be completed both prior to and following plastering. This work should not be done after finishing because there is a significant chance that it will contaminate the wall surfaces nearby. When making a decision, accuracy needs to be followed.

It is also more convenient to pour before continuing hotel work because it keeps the entire floor at the same level and makes it easier to perform the most crucial labor operations—such as tiling walls, which require height markings.

Work with drywall

Generally speaking, wet work is completed before dry work. This is generally true because the wet drying finish can damage drywall, causing it to collapse or turn into a mold colony.

Consequently, plastering is completed before the Gipro ceilings are installed. This is also more practical because, particularly with brick walls, the profile rests much better on a level surface.

Partitions made of this material may be an exception if you are unsure about the screed’s ability to support the weight. After deciding to construct partitions before installing floors, it’s important to keep in mind that the lower portions of the floors need to be kept dry. A waterproofing device that ends above the draft level can be used for this.

Installing the ceiling frame and placing the sheets above the screed is the second method to keep dry. The installation of the frame might necessitate additional temporary and material costs, but these are minimal.

Plaster can be substituted with gypsum cardboard in situations where the surface is not subjected to loads, meaning that heavy objects like cabinets won’t be hanging on it.

The electric cable is wired in between the frame installation and the HCL fastener.

Facing tiles

In this case, the opposite order—from the bottom up—is ideal. In other words, the floor is clearly tiled beneath the level, and then the walls are tiled. Sadly, this is rarely (if at all) possible, so the result is this: wall cladding starts from the second row and ends at a temporarily installed profile. The most important thing is to figure out how clean sex will be. This method allows you to line the floor and the wall’s first row of tiles first.

After the wall is leveled, tile work is done. It is not possible to cover the sores, but the maximum amount of tile glue that can be applied is 8 mm in the plaster soil layer. Although priming the wall is still necessary, it is simpler to glue the tile onto moisture-resistant drywall. As a primer, you can use concrete-pin soils if you are unsure about the base’s strength.

In any case, the wiring is run to the facing work, and in addition, holes are made beneath the sockets, which are subsequently repeated on the tile. There won’t be any more challenges installing glasses under sockets because of this arrangement.

Slopes on the windows

Frequently, the suite of windows includes this kind of service. Use it quickly to avoid becoming enslaved to someone else’s work schedule. Slopes vary greatly in type, and there is a specific window of time in which they can be set.

  • Plaster are made simultaneously with plaster.
  • The slopes of Gipro are mounted after plastering, but before putty.
  • Slopes from PVC panels are installed after finishing.

As a result, the assembled forms of this window component are created in phases: from putty to drywall, and then the patch panel upon completion.

When it comes to completing a private home’s interior, meticulous planning and attention to detail are essential. Numerous tasks that improve the living space’s aesthetics and functionality are included in interior work. Every stage, from laying flooring to painting walls and ceilings, helps to create a space that is both cozy and aesthetically pleasing.

The choice of materials is one of the most important parts of interior finishing. Selecting appropriate and long-lasting materials guarantees longevity and minimal upkeep. For instance, choosing premium paints and finishes can give the rooms a new, lively appearance while shielding the walls from deterioration. In a similar vein, choosing durable flooring options like hardwood or tiles improves the room’s usefulness as well as its aesthetic appeal.

The coherence of design components is an additional essential factor. Homeowners can showcase their individual style with interior finishing by utilizing distinct color palettes, furnishings, and ornamental details. In order to create a harmonious and welcoming atmosphere, it is necessary to balance various elements, such as textures, patterns, and lighting, in a cohesive design scheme.

Furthermore, the overall atmosphere of the house can be greatly influenced by the attention to detail used during the interior finishing process. Every little thing, from where electrical outlets and fixtures are located to how doors and windows are installed, adds to the practicality and comfort of the living areas. Careful design and expert construction guarantee that the finished interiors not only live up to but surpass the homeowners’ expectations.

Video on the topic

Stages of work after the construction of the "box" at home. The sequence of work.

What is needed to enter the house? Stages of interior decoration of the house | Eco Park

Stages of repair of a private house / finishing and engineering work in a private house

What type of facade do you like best?
Share to friends
Alice Eliseeva

Designer with 3 year old experience. I believe that the facade is the face of the house, so it should be not only beautiful, but also reflect the individuality of the owner. In my work I use: the latest 3D-visualization technologies, an individual approach to each client and a wide range of materials and solutions.